Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Jining Jiuzhong Machinery Equipment Co., Ltd. Sales Department

3kw rock drilling rig 5.5kw soil drilling rig 7.5kw engineering drilling rig ...

sell
  • There is no classification
contact
  • Contact:赵经理
  • Phone:0537-7977773
  • Email:2715966603@qq.com
  • fax:0537-7977773
search
 
link
  • There is no link yet
home > sell > Anhui Tongling ZLJ350 water exploration drilling rig brand new 100-meter drilling rig
Anhui Tongling ZLJ350 water exploration drilling rig brand new 100-meter drilling rig
products: Views:5Anhui Tongling ZLJ350 water exploration drilling rig brand new 100-meter drilling rig 
brand: 九众
型号: ZLJ-350
产地: 山东济宁
包装: 木箱
price: 128.00元/台
MOQ: 1 台
Total supply: 93 台
Delivery date: Shipped within 2 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-12-09 15:22
 
Details
Water exploration drilling rig
Tunnel drilling rig is used for drilling and grouting of subway tunnels, cable trench tunnels and foundation pits. Ground geological exploration, building foundation reinforcement, coal mine, iron ore, gold mine underground water exploration at various angles, coal water blocking, gas drainage inside the mine, water exploration holes for drilling, geological structure holes, fire extinguishing holes, gas drainage and Engineering holes for other purposes, geological drilling holes and other engineering holes can also be drilled on the ground. Geological drilling holes and other holes for other purposes can also be drilled on the ground. Iron ore and aluminum ores are used to drill rocks to facilitate mining of ores. This drilling rig adopts mechanical transmission and hydraulic feed, and has the characteristics of small size, light weight, easy operation and maintenance.
The tunnel water drilling machine can be used for drilling and coring in coal mines, and can meet different coal mine operations. The tunnel drilling machine can meet the drilling and coring requirements at different angles. The tunnel drilling rig is simple to operate and has high work efficiency, which can save coal mine manpower, material and financial resources.
Rated torque

Rated speed
/
Drilling angle
~
Drill pipe diameter

Water supply Pressure
.~
Motor model

Motor power

Machine weight

Rated current

Maximum feed

Motor voltage
/
Propulsion stroke

When the tunnel drilling rig has a large well depth (above meters), the chip removal capacity is greater than that of the tunnel drilling rig. Drilling rigs with pump suction or jet reverse circulation are therefore suitable for situations with large well depths, arid areas lacking water, and frozen permafrost strata.
Water exploration drilling rigs have a wide range of uses. Whether you are working in coal mines, rock mines, metal mines, engineering, tunnels, or tunnel drilling, drilling rigs can meet the needs of drilling operations. Whether you are coring or drilling, prospecting or prospecting, tunnel drilling Drilling rigs can meet the usage requirements.
Transmission system The transmission system of the drilling rig is shown in Figure 2. The power of the motor is transmitted to the gearbox by three V-belts, and at the same time, it is transmitted to the oil pump of the hydraulic system by one V-belt ( ). The lower chuck is a manual chuck, and the upper chuck is a hydraulic spring chuck. The transmission consists of three pairs of spur gears and two parallel spline shafts. The power is first transmitted to the large pulley by the electric motor, and then passes through the transmission chain composed of different pairs of gears to transmit the power to the small arc bevel gear.
The hydraulic system consists of multi-way reversing valves, throttle valves, relief valves, oil pipes, etc.
Precautions for operating the drilling rig
Before drilling, check whether the drilling rig is installed smoothly and securely, whether any fasteners are loose, and check the oil level in the gearbox and oil tank. If it is insufficient
should be supplemented. Check whether the tightness of the holding brake is appropriate. Jog the motor to check the direction of motor rotation, whether the water feeder rotates flexibly, and whether the water delivery hose is fixed to prevent rotation.
Every time the speed is changed, or the winch is connected or disconnected, the motor must be turned off first.
Factory address Liying Industrial Park, Rencheng District, Jining, Shandong
Sales phone number
Consultation
Request for quotation
A total of0articles  Related Comments: